| 01. |
GENERAL
ADMINISTRATION |
39% |
| |
0101.
Customer Service
Interview customers and determine their needs and assess the scope of their project and direct them. Communicate with customers and staff using the appropriate terminology. Educate customers. Employ organizational skills. |
7% |
|
| |
0102.
Project Applications
Verify that the project has all prerequisite approvals. Verify that application and the project information provided is complete and is acceptable. Verify professional and contractor licensing where necessary. |
9% |
|
| |
0103.
Basic Building Concepts
Review the basic building concepts on plans for content. Verify basic details, elements or components of plans for completeness. |
8% |
|
| |
0104.
Permit Issuance and Fees
Process documents for required approvals. Calculate and verify valuations and fees and accept financial guarantees. Issue permits. |
8% |
|
| |
0105. Inspections and Certificate of Occupancy
Accept inspection requests. Verify that special inspections are performed where required. Track permit status. Coordinate approvals for and prepare the Certificate of Occupancy.
|
7% |
|
| 02. |
LEGAL
ASPECTS |
22% |
| |
0201.
Public Information and Legal
For new and existing projects, answer questions about the need for approvals, permits and inspections, general code compliance of designs, procedures and materials. Address liability and public disclosure issues when necessary. |
10% |
|
| |
0202.
Records Management
Verify that the necessary documents are retained for the period required and available as needed. |
4% |
|
| |
0203.
Record Research
Research and document project history and code compliance. |
5% |
|
| |
0204. Appeals and Revocation
Process appeals and suspension or revocation of approvals, decisions and/or permits.
|
3% |
|
| 03. |
PLANS
AND DOCUMENTS |
25% |
| |
0301. Review
Related Documents
Verify content of plans, engineered construction drawings and/or specifications for submittal. Determine the need and/or level of review. |
9% |
|
| |
0302.
Occupancy Group and Type of Construction
Verify that the occupancy classifications and the types of construction are designated on the plans and/or permit documents. |
6% |
|
| |
0303.
Read Maps
Read and identify map and plat/tract specifications and components. |
5% |
|
| |
0304. Perform Calculations and Use Scales
Use architectural and engineering scales to determine basic dimensions and calculate areas and percentages.
|
5% |
|
| 04. |
ZONING
AND SITE DEVELOPMENT |
14% |
| |
0401.
Land Use
Explain the site plan review process or developmental plan review and land use codes. |
4% |
|
| |
0402.
Right-of-Way, Utilities and Easements
Determine public right-of-way and private and public easements. Regulate construction in public right-of-way. |
5% |
|
| |
0403. Site Plan Review
Verify structure location on the lot, zoning and engineering requirements. Verify required set back and percentage of lot coverage. Recognize the need for variances.
|
5% |
|
|