| Exam ID: 77 or Level 77 |
| |
- 50 multiple-choice questions
- 2-hour limit
- Open book
|
| Sample Examination Questions: The
sample questions are provided to give you an idea of the
style and format of examination questions. The questions
are not intended to represent content, references or questions
that will be on the examination. They are not intended
nor should they be referenced/used as a study tool for
the examination. |
| 1. |
The R-value is the inverse of the _____?
Click for Answer
|
| |
|
A. |
U-factor |
| |
|
B. |
ratio of solar heat gain |
| |
|
C. |
perm rating for vapor retarders |
| |
|
D. |
watts per square foot of floor area |
| 2. |
A duct system consists of all the following,
except: Click for Answer
|
| |
|
A. |
fittings. |
| |
|
B. |
dampers. |
| |
|
C. |
thermostatic controls. |
| |
|
D. |
air-handling equipment. |
| 3. |
Construction documents shall contain details
on all of the following, except: Click
for Answer |
| |
|
A. |
ventilation rates. |
| |
|
B. |
insulation materials and R-values. |
| |
|
C. |
fenestration U-factors and SHGC values. |
| |
|
D. |
equipment efficiencies, types, sizes, and
controls. |
| 4. |
Compliance under the Total Building Performance
method shall be demonstrated by: Click for Answer
|
| |
|
A. |
energy rates. |
| |
|
B. |
energy costs. |
| |
|
C. |
annual climate data. |
| |
|
D. |
annual building operation.
|
| 5. |
An enclosed stairwell serves the unconditioned
basement below a new wood-framed retail store in Climate
Zone 4. What is the required minimum prescriptive insulation
R-value for the walls surrounding the stairwell? Click for Answer
|
| |
|
A. |
R-0 |
| |
|
B. |
R-13 |
| |
|
C. |
R-13 + R-38 |
| |
|
D. |
R-19 |
|
|
|
|
Return to certification category
|