ICC logo masthead graphic masthead graphic
 
masthead graphic
MembershipProduct StoreCodes & StandardsGovernment RelationsTrainingCertification and TestingConsumer SafetyJobs and Code TalkNewsroom and Events

Inspector  |  Contractor  |  Renewals  |  UST / AST Certification  |  Legacy / State



Certification: Prestressed Concrete Special Inspector

Exam ID: 92
 
  • 90 multiple-choice questions
  • 3½-hour limit
  • Open book
Prerequisites: This exam can be taken at any time but the certification cannot be issued until the Reinforced Concrete Special Inspector certification is achieved.
Content Outline: A detailed outline of the subject matter covered by the exam, including the percentage of questions from each content area and task.
01. General Requirements
Comply with special inspection requirements of the enforcing jurisdiction. Review approved plans and specifications for project details that pertain to special inspection requirements. Notify the contractor of deviations from approved plans and specifications. If the deviations are uncorrected, notify the architect or engineer of record and the building official of deviations. Submit progress reports to the architect or engineer of record and the building official, describing tests that were performed and compliance of work. Submit final summary report stating whether work requiring special inspection was in conformance with the approved construction documents and applicable provisions of the building code.
2%
02. Concrete Quality
Verify that individual batch tickets indicate delivery of the approved mix as specified. Verify time limits of mixing, total water added, and proper consistency and workability for placement. Determine the required type, quantity and frequency of tests to be performed on fresh and hardened concrete. Observe sampling of concrete, field testing of fresh concrete and making of test specimens. Provide or arrange for proper specimen identification, site storage and protection, and transportation to the testing laboratory. Provide or arrange for communication of field testing results to the architect or engineer of record and to the building official.
5%
03. Reinforcement
Verify that reinforcing steel and tendons are of the type, grade and size specified and are in conformance with acceptable quality standards. Verify that the reinforcing steel and tendon system are fabricated in conformance with acceptable quality standards. Verify that at the time of concrete placement tendons are free of oil, dirt and excessive rust, and are properly coated and/or sheathed as specified. Verify that reinforcing steel and tendons are located within specified tolerances, and are adequately supported and secured to prevent displacement during concrete placement. Verify that minimum concrete cover is provided. Verify that placement of reinforcing steel and tendons (or ducts) comply with spacing, profile and quantity requirements, as indicated by the installation drawings and approved plans. Verify that hooks, bends, ties, stirrups and supplemental reinforcement are fabricated and placed as specified. Verify that required lap lengths, stagger and offsets are provided. Verify proper installation of approved mechanical connections per the manufacturer's instructions and/or evaluation reports. Verify that welds have been inspected and approved as specified. Verify that prestressed rock and soil anchors are fabricated and installed as specified.
48%
04. Prestressing and Grouting
Verify that the required concrete strength has been attained prior to transferring prestressing forces. Verify proper equipment calibration. Verify that proper stressing (or tensioning) sequences are used, proper jacking forces are applied, and acceptable elongations are attained and recorded. Verify that tendons and anchorages are properly sealed or otherwise protected as specified. Verify that ducts, including inlets and outlets, are of the required size, are mortar-tight and are located correctly. Verify that proper grout materials, strength and grouting pressures are used as specified.
35%
05. Formwork, Joints and Embeds
Verify that formwork will provide concrete elements of the specified size and shape. Verify that the location and preparation of construction joints are in accordance with the approved plans, specifications, and applicable codes and standards. Verify that the type, quantity, size, spacing, condition and location of embedded items are as specified.
5%
06.

Concrete Placement, Protection and Curing
Verify acceptable condition of the place of deposit before the concrete is placed. Verify that methods of conveying and depositing concrete avoid contamination, segregation of the mix, and displacement of reinforcement, embedments and forms. Verify that concrete is being properly consolidated during placement. Verify that concrete is protected from ambient temperature extremes during placement and curing. Verify that concrete is being cured as specified by approved plans, specifications and applicable codes.

5%

Return to certification category


 

Contact Information

1-888-ICC-SAFE (422-7233), ext.
Certification Examinations
33806
Certification Renewal
33815
MCP Certification Examinations
33806
CBO Examinations
33806
Contractor Examinations
33805
Legacy Examinations
33823
UST/AST Examinations
33823
Special Inspection Examinations
33823



Click for more information

 

 
Home | Membership | ICC Store | Codes & Standards | Government Relations
Training | Certification & Testing | Public Safety | Jobs & Code Talk | Newsroom & Magazine
Contact Us | Privacy Policy | Vision, Mission & Values | Blueprint to the Future
Subsidiaries: ICC Evaluation Service | International Accreditation Service | ICC Foundation
© 2008 International Code Council

 

About ICC ICC Board Site Map Contact Us Help