Certification: New Jersey Plumbing Plans Examiner

Exam ID: N3
 
  • 50 multiple-choice questions
  • Open book
  • 2-hour time limit
Content Outline: A detailed outline of the subject matter covered by the exam, including the percentage of questions from each content area and task.
1. General Requirements
Includes verification of piping systems to be protected as required from corrosion, stress and stain, freezing, and physical damage, to include building components. Also to verify that piping systems are designed to provide for proper installation, support, penetrations and waterproofing of exterior openings. Read plans verifying that fixtures, appliances and other systems comply with code.
4%
2. Fixtures
Verify plans for proper installation of fixtures including waste receptors, appliances and appurtenances. Verify plans for proper installation of faucets, fixtures and fittings.
11%
3. Water Heaters
Verify Plans for proper use of materials required valves, T&P valve and discharge piping installation, thermal expansion requirements. Verify plans for proper size of fuel gas piping, combustion air requirements and required venting.
9%
4. Water Supply and Distribution
Verify plans for proper piping material, joints and connections. Verify the waterservice and distribution piping for proper installation of cold and hot water delivery including minimum and maximum pressure and volume requirements, identification, sizing, valves, and insulation. Verify the potable water supply and distribution piping for proper protection against contamination.
20%
5. Sanitary Drainage
Verify proper material, sizing and installation of the building drain, building sewer, branches and stacks. Verify for the proper installation of backwater valves, sumps, ejectors and required cleanouts. Verify indirect waste systems for condensate drains, pumps and tanks.
16%
6. Vents
Verify plans show approved materials and the proper us of materials, fittings, joints and connections. Verify plans show proper sizing and minimum venting requirements and methods including terminations.
14%
7. Traps, Interceptors, Separators, Special Piping and Storage Systems
Verify plans show proper use and connection of traps, interceptors and separators. Verify plans show required chemical treatment, high-temperature and neutralization systems.
10%
8. Storm Drainage
Verify plans show proper design of roof drains, conductors and leaders including approved materials and sizing. Verify plans show proper design of sub-soil and building sub-drains, sumps and pumping system.
8%

9. Health Care Plumbing
Verify plans show approved materials, fixtures and locations. Verify plans show proper application of fixtures including accessibility, waste receptors, appliances and appurtenances including clearances, access and sealing. Verify plans show proper design of service and distribution of cold and hot water delivery. Verify plans show potable water supply and distribution piping including proper protection against contamination.

8%

Return to certification category


 

Contact Information

1-888-ICC-SAFE (422-7233), ext.
Certification Examinations
33806
Certification Renewal
33815
MCP Certification Examinations
33806
CBO Examinations
33806
Contractor Examinations
33805
Legacy Examinations
33823
UST/AST Examinations
33823
Special Inspection Examinations
33823



Click for more information

 

 
Home | Membership | ICC Store | Codes & Standards | Government Relations
Training | Certification & Testing | Public Safety | Jobs & Code Talk | Newsroom & Magazine
Contact Us | Privacy Policy
Subsidiaries: ICC Evaluation Service | International Accreditation Service | ICC Foundation
© 2008 International Code Council

 

About ICC ICC Board Site Map Contact Us Help