| 01. |
Administrative |
5% |
| |
0101. Determine if a permit is required, the submittal is complete and meets the scope of the One and Two Family Dwelling Code. |
3% |
|
| |
0102. Communicate with the applicant need for further information, alerting them of deficiencies in their submittal, or of their approval to start work; mark the official approved sets of drawings after approval. |
2% |
|
| 02. |
Site |
|
10% |
| |
0201. Verify from the site plan that the building or structure location is in compliance with the requirements of the local ordinances, fire separation regulations, fire access, flood-hazard areas, setbacks, encroaching on any legal easement, wetland, right of way or neighboring property. |
8% |
|
| |
0202. Verify that final grade will provide the required slope away from the footing or foundation wall and will not adversely affect neighboring property. |
2% |
|
| 03. |
Architectural & Life Safety |
25% |
| |
0301. Verify adequate room sizes, ceiling heights, heat, light and ventilation are provided. |
3% |
|
| |
0302. Verify adequate means of egress, with proper widths, stairs, guards, rails and openings. |
8% |
|
| |
0303. Verify fire protection thru rated walls, draft stopping, smoke detectors and sprinklers. |
5% |
|
| |
0304. Verify safety requirements for glazing and foam plastic elements. |
3% |
|
| |
0305. Verify that exterior veneers and siding have correct anchorage, support and backing. Verify that a weather-resistant barrier is correctly specified for all walls and around all wall openings. Verify that exterior sheathing materials are correctly sized and specified. Verify that plaster, stucco and metal lath have correct thickness and fasteners. |
3% |
|
| |
0306. Verify unique requirement compliance for specialty, detached and accessory structures such as pools, spas, fireplaces, and storage buildings. |
3% |
|
| 04. |
Structural |
25% |
| |
0401. Verify designer used the correct design loads. |
2% |
|
| |
0402. Verify that footings are designed to correct depth, size, setbacks and that footings will extend below the frost line. Verify footing drains for basements and crawl spaces for compliance with the code. Identify soil type and verify that bearing capacity is adequate. |
3% |
|
| |
0403. Verify that foundation walls are correctly sized and have sufficient height above grade. Verify that foundation wall materials, reinforcement, anchor bolts and fasteners are correct type, size and grade and are located in accordance with building code requirements. Verify that foundation dampproofing and waterproofing are to be provided. |
5% |
|
| |
0404. Verify that structural elements are correctly designed to support loads and maintain load path continuity. Structural elements can include: Beams, Girders, Trusses, Headers, Joists, Rafters, Columns, Piers, Walls and Bracing as well as others not listed. |
7% |
|
| |
0405. Verify lateral bracing is adequate to meet required load conditions such as wind and seismic loads. |
5% |
|
| |
0406. Verify construction design for wall systems built below the lowest finished floor in flood zones. |
1% |
|
| |
0407. Verify pre-manufactured construction elements are to be utilized in accordance with their listing. |
2% |
|
| 05. |
Energy Efficiency |
5% |
| |
0501. Verify energy saving provision for the building envelope, mechanical equipment and appliances comply with the code and are indicated on the plans. |
5% |
|
| 06. |
Mechanical |
10% |
| |
0601. Verify adequate protection, support, space and clearance are provided for mechanical equipment and appliances. |
2% |
|
| |
0602. Verify adequate room volume for combustion air or alternate provisions. |
2% |
|
| |
0603. Verify proper application of venting and venting termination. |
2% |
|
| |
0604. Verify proper fuel gas pipe size to provide adequate gas to appliances and equipment. |
2% |
|
| |
0605. Verify that special systems utilizing fuel burning equipment such as interior open-flame grills, pool and sauna heaters, hydronic heating systems and Decorative Appliances comply with code requirements, the manufacturer's instructions, and listing of the equipment and have proper access and clearances. |
2% |
|
| 07. |
Plumbing |
10% |
| |
0701. Verify minimum required fixtures are provided in proper location with correct clearances. |
3% |
|
| |
0702. Verify adequate clearances and support are provided for piping and piping termination. |
1% |
|
| |
0703. Verify potable water system is provided and protected. |
3% |
|
| |
0704. Verify sanitary disposal system is provided and protected. |
3% |
|
| 08. |
Electrical |
10% |
| |
0801. Verify adequate service is being provided for the building as per the load calculation. |
2% |
|
| |
0802. Verify required circuits and disconnects are provided. |
1% |
|
| |
0803. Verify the method and location of the grounding and grounding electrode systems. |
2% |
|
| |
0804. Verify that outlets, switches, luminaires and receptacles, including GFCI and AFCI protection, are installed in required locations. |
2% |
|
| |
0805. Verify electrical panel location and working space clearances. |
1% |
|
| |
0806 Verify bonding of metallic housings and elements. |
1% |
|
| |
0807 Verify proper conductor and conduit sizing and support. |
1% |
|