Certification: UST Installation / Retrofitting

Exam ID: U1
 
  • 70 multiple-choice questions
  • 1½-hour limit
  • Closed book
IMPORTANT: For Illinois UST licensing, you must take the exam at a Promissor testing site, since your photo is required on the score report letter you receive at the conclusion of your exam.
Sample Examination Questions: The sample questions are provided to give you an idea of the style and format of examination questions. The questions are not intended to represent content, references or questions that will be on the examination. They are not intended nor should they be referenced/used as a study tool for the examination.
1. Before any underground storage tank lines are installed, the trench for piping should receive a bed of well-compacted bedding at least _____ inches deep. Click for Answer
    A. 2
    B. 6
    C. 12
    D. 18
2. After the amount of deflection in a newly installed fiberglass-reinforced plastic tank has been measured, how is the acceptable amount of deflection determined? Click for Answer
    A. Check with the tank manufacturer if the actual deflection exceeds the limits established by that manufacturer.
    B. Multiply the number of inches of tank deflection by a factor of 0.0786.
    C. Compare the number of inches of vertical deflection with the nominal diameter of the tank, and see if it exceeds 1.4 percent.
    D. Fill the inside of the tank with water to establish whether the deflection exceeds acceptable residual stress levels.
3. In a properly installed double wall UST pressurized flexible piping system, with turbine and dispenser sumps, which of the following is NOT necessary? Click for Answer
    A. Flex connector
    B. Pipe penetration fitting
    C. Automatic line leak detector
    D. Testing of both primary and secondary piping prior to backfill.
4. Underground storage tank systems with impressed current cathodic protection systems must be inspected every _____ to ensure the equipment is running properly. Click for Answer
    A. 60 days
    B. 90 days
    C. 6 months
    D. year
5. When steel tanks arrive at the jobsite, they should be unloaded by: Click for Answer
    A. rolling off the truck sideways.
    B. sliding off the truck on skids.
    C. pulling off the truck with a winch.
    D. lifting off the truck with a cable attached to tank-lifting lugs.

Return to certification category


 

Contact Information

1-888-ICC-SAFE (422-7233), ext.
Certification Examinations
33806
Certification Renewal
33815
MCP Certification Examinations
33806
CBO Examinations
33806
Contractor Examinations
33805
Legacy Examinations
33823
UST/AST Examinations
33823
Special Inspection Examinations
33823



Click for more information

 

 
Home | Membership | ICC Store | Codes & Standards | Government Relations
Training | Certification & Testing | Public Safety | Jobs & Code Talk | Newsroom & Magazine
Contact Us | Privacy Policy | Vision, Mission & Values | Blueprint to the Future
Subsidiaries: ICC Evaluation Service | International Accreditation Service | ICC Foundation
© 2008 International Code Council

 

About ICC ICC Board Site Map Contact Us Help