| 01. |
UST Systems (Content
Area) |
20% |
| |
0101. Tanks, Piping,
Containment and Monitoring Systems (Task) 13%
Identify type, size, material and contents of tank.
Identify the type and placement of monitoring systems.
Identify piping, type and material, pressure / suction
piping. Determine if the UST system has secondary
containment. |
|
| |
0102. Operation Authority
(Task) 7%
Determine laws and regulations under which the facility
is operated. Determine laws and regulations applicable
to temporary and permanent closure. Verify compliance
with applicable local, state laws. |
|
| 02. |
Operating Requirements
(Content Area) |
30% |
| |
0201. Overfill and
Spill Protection (Task) 7%
Verify that overfill protection and spill prevention
devices present & operational. |
|
| |
0202. Corrosion Protection
(Task) 4%
Verify the cathodic protection system is operational
and that cathodic protection testing is performed
at required intervals. |
|
| |
0203. Inspections
and Emergency Equipment (Task) 12%
Verify that sumps and spill containment boxes are
inspected for accumulation of liquid and debris.
Inspect hardware such as nozzles, breakaway couplings,
hoses and impact valves. Verify emergency equipment
shut-off, fire extinguishers & fire suppression
systems & alarm pull boxes in place & operational. |
|
| |
0204. Good Housekeeping
and Employee Training (Task) 7%
Determine the proper action to take to clean up
and handle product spills, overflow from a tank
or customer container or remove water from tank
systems. Provide annual training of facility employees. |
|
| 03. |
Release Detection
(Content Area) |
25% |
| |
0301. Single Wall
Release Detection (Task) 7%
For single wall tanks and piping, verify correct
method of release detection is in place and that
all required periodic testing & maintenance
is performed at the required frequency. Verify that
any leak detection devices and equipment are operational
and have third party certification if applicable. |
|
| |
0302. Double Wall
Release Detection (Task) 18%
For double wall tanks and piping, verify correct
method of release detection is in place and that
all required periodic testing & maintenance
is performed at the required frequency. Verify that
any leak detection devices and equipment are operational
and have third party certification if applicable. |
|
| 04. |
Record Keeping (Content
Area) |
17% |
| |
0401. Release Detection
Record Keeping (Task) 7%
Maintain written performance claims, results of
sampling, testing monitoring, written documentation
of calibration, maintenance & repair. |
|
| |
0402. General Operating
Recordkeeping and Reporting (Task) 4%
Maintain records of the operation and testing of
the corrosion protection, and vapor recovery systems. |
|
| |
0403. Installation,
Upgrade, Repair and Closure Records (Task) 2%
Maintain records of all installation, upgrade, repairs
and closures. |
|
| |
0404. Financial Responsibility
(Task) 4%
Maintain financial responsibility. |
|
| 05. |
Release Reporting
and Confirmation (Content Area) |
8% |
| |
0501. Reporting of
Suspected Release (Task) 4%
Report releases as required to the implementing
agency within the required time frame. Maintain
records of releases. |
|
| |
0502. Reporting
and Cleanup of Spills and Overfills (Task) 4%
Contain and immediately clean up a spill or overfill
and report such to the implementing agency within
the required time. |
|