BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ICC - ECPv6.15.17.1//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:ICC
X-ORIGINAL-URL:https://www.iccsafe.org
X-WR-CALDESC:Events for ICC
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Chicago
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20240310T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20241103T070000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20250309T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20251102T070000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20260308T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20261101T070000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20250121T110000
DTEND;TZID=America/Chicago:20250121T123000
DTSTAMP:20260501T065311
CREATED:20250107T171236Z
LAST-MODIFIED:20250107T171236Z
UID:578033-1737457200-1737462600@www.iccsafe.org
SUMMARY:Design of Loadbearing Tall Wood Studs for Wind and Gravity Loads
DESCRIPTION:Proper design of wood structures to resist high wind loads requires the correct use of wind load provisions and member design properties. A thorough understanding of the interaction between wind loads and material properties is important in the design process. Adjustments from reference wind conditions to extreme-value peak gusts require designers to make similar adjustments to design properties to ensure equivalent and economic designs. Wind load provisions have been developed for design of major structural elements using Main Wind-Force Resisting System (MWFRS) loads and secondary cladding elements using Component & Cladding (C&C) loads. Elements and subassemblies which receive loads both directly and as part of the main wind force resisting system\, such as wall studs\, must be checked independently for MWFRS loads and C&C loads. A load bearing stud wall design example based on the allowable stress design methods outlined in AWC`s 2018 National Design Specification® (NDS®) for Wood Construction and 2018 Wood Frame Construction Manual along with ASCE 7-16 Minimum Design Loads and Associated Criteria for Buildings and Other Structures will demonstrate standard design checks for limit states of strength and deflection. \nLearning Objectives: \n\nUnderstand how to analyze wall framing as part of the MWFRS per ASCE 7-16\nUnderstand why wall framing is analyzed using out of plane C&C wind pressures independent of gravity loads\nBe familiar with various ASCE 7-16 ASD load combinations used for bearing walls\nBe knowledgeable of standards including the 2018 NDS\, 2018 WFCM\, and ASCE 7-16 used for design of tall walls\n\nFinally\, the example problem we’ll be presenting\, is contained in this document:\nExamples: Structural Wood Design Examples 2015/2018 Edition \nRegister here. \n11:00 AM – 12:30 PM PT
URL:https://www.iccsafe.org/news-and-events-calendar/design-of-loadbearing-tall-wood-studs-for-wind-and-gravity-loads-2/
CATEGORIES:Education Calendar
ORGANIZER;CN="S. K. Ghosh Associates":MAILTO:kbhaumik@skghoshassociates.com
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20250121T120000
DTEND;TZID=America/Chicago:20250121T140000
DTSTAMP:20260501T065311
CREATED:20241219T160105Z
LAST-MODIFIED:20241219T160210Z
UID:577476-1737460800-1737468000@www.iccsafe.org
SUMMARY:Plumbing\, Mechanical and Fuel Gas Code Action Committee Meeting
DESCRIPTION:Discussion of topics for PMGCAC proposals\n\n\n\n  \nMeeting Link: \nJoin the meeting now\nOR \nDial in by phone \n1-469-848-0134 \nPhone conference ID: 914 374 938# \n12:00 PM – 2:00 PM EST \n 
URL:https://www.iccsafe.org/news-and-events-calendar/plumbing-mechanical-and-fuel-gas-code-action-committee-meeting/
CATEGORIES:Codes & Standards Calendar
ORGANIZER;CN="Fred Grable":MAILTO:fgrable@iccsafe.org
END:VEVENT
END:VCALENDAR