BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ICC - ECPv6.15.17.1//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://www.iccsafe.org
X-WR-CALDESC:Events for ICC
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Chicago
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20240310T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20241103T070000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20250309T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20251102T070000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20260308T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20261101T070000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20250410T110000
DTEND;TZID=America/Chicago:20250410T133000
DTSTAMP:20260616T173616
CREATED:20250327T173632Z
LAST-MODIFIED:20250327T173632Z
UID:583341-1744282800-1744291800@www.iccsafe.org
SUMMARY:Designing to Minimize Restraint to Shortening Cracks in Post-Tensioned Structures
DESCRIPTION:Two of the main financial benefits of post-tensioning is the reduction in slab thickness and rebar compared to non-prestressed slabs. The downside side of this reduction is post-tensioned structures can be more susceptible cracking\, especially if their inherent movement is prevented or restrained. The webinar will cover the structural layout and details that are primarily used in the post-tensioned structures to minimize restraint to shortening (RTS) cracks. Typical post-tensioning slip details will be explained in conjunction with construction photographs to highlight good and poor construction practices. \nRegister here.  \n11:00 AM – 1:30 PM PT
URL:https://www.iccsafe.org/news-and-events-calendar/designing-to-minimize-restraint-to-shortening-cracks-in-post-tensioned-structures/
LOCATION:TN
CATEGORIES:Education Calendar
ORGANIZER;CN="S. K. Ghosh Associates":MAILTO:kbhaumik@skghoshassociates.com
END:VEVENT
END:VCALENDAR