BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ICC - ECPv6.15.17.1//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://www.iccsafe.org
X-WR-CALDESC:Events for ICC
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/New_York
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20250309T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20251102T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20260308T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20261101T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20270314T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20271107T060000
END:STANDARD
END:VTIMEZONE
BEGIN:VTIMEZONE
TZID:America/Chicago
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20250309T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20251102T070000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20260308T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20261101T070000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20270314T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20271107T070000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;VALUE=DATE:20260112
DTEND;VALUE=DATE:20260213
DTSTAMP:20260502T062955
CREATED:20260115T182205Z
LAST-MODIFIED:20260115T182446Z
UID:623227-1768176000-1770940799@www.iccsafe.org
SUMMARY:Public Comment Period - 2030 International Energy Conservation Code®
DESCRIPTION:The ICC Board has established a new framework for developing the 2030 International Energy Conservation Code® (IECC®) that moves its content into two documents\, the IECC and IECC Expanded. This split ensures that ICC continues to develop energy codes that meet the varied needs of jurisdictions in the U.S. and around the globe. \nThe intent of the IECC is to establish minimum requirements for the energy-efficient design and construction of buildings\, focused on initial construction costs and the operational energy performance of the building. \nThe intent of the IECC Expanded (IECCX) is to provide additive requirements that provide market-driven\, enforceable requirements that achieve a reasonable level of energy efficiency that is safe\, technologically feasible\, and life cycle cost effective\, considering economic feasibility\, including potential costs and savings for consumers and building owners\, and return on investment. \nThe IECC Expanded may include optional or mandatory provisions incorporating additional energy efficiency and greenhouse gas reduction resources and provisions that lead to achievement of zero energy buildings. The IECC Expanded will provide reasonable compliance options for all energy sources in common use\, while allowing requirements to reflect evolving technologies and practices. \nTo view the proposed 2030 IECC/IRC Chapter 11/IECC Expanded (IECCX) Scope and Intent draft document\, click here. \nHow to Submit Public Comments \nWe welcome your comments on the proposed 2030 IECC/IRC Chapter 11/IECC Expanded (IECCX) Scope and Intent draft document. Please submit your comments through this form by 11:59 pm Pacific Time on February 15\, 2026.   
URL:https://www.iccsafe.org/news-and-events-calendar/public-comment-period-2030-international-energy-conservation-code/
CATEGORIES:Codes & Standards Calendar
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20260126T080000
DTEND;TZID=America/New_York:20260129T170000
DTSTAMP:20260502T062955
CREATED:20251125T161923Z
LAST-MODIFIED:20251125T161923Z
UID:619925-1769414400-1769706000@www.iccsafe.org
SUMMARY:ICC B1 Test Academy
DESCRIPTION:Join the New Hampshire Building Officials Education Foundation for an ICC B1 Test Academy. NHBOEF is helping you prepare for your examination by providing you with effective study tools. Join your colleagues for this dedicated exam preparation opportunity! \nTopics Covered: Code Administration\, Footings and Foundation\, Wall Construction and Coverings Public Safety\, Building Planning\, Floor Construction\, Roof/Ceiling Construction\, Special Construction \nEarn 2.1 CEUs for participating in this event. \nEvent Details: https://www.iccsafe.org/wp-content/uploads/25-25307_TRN_NHOA_FLR_FINAL_HIRES.pdf
URL:https://www.iccsafe.org/news-and-events-calendar/icc-b1-test-academy/
LOCATION:Sheraton Harborside Hotel\, Portsmouth\, NH
CATEGORIES:Education Calendar
ORGANIZER;CN="ICC Training":MAILTO:learn@iccsafe.org
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20260129T090000
DTEND;TZID=America/Chicago:20260129T170000
DTSTAMP:20260502T062955
CREATED:20251202T195208Z
LAST-MODIFIED:20251202T195208Z
UID:620340-1769677200-1769706000@www.iccsafe.org
SUMMARY:2024 ISPSC Design\, Installation and Inspection Principles (Online Live)
DESCRIPTION:This course will provide an overview of the key information in the 2024 International Swimming Pool & Spa Code (ISPSC) as well as the technical information recommended for plan review and field inspections for Residential Swimming Pools and Spas/Hot Tubs for new construction and remodeling. Learners will explore the compliance of standard requirements for pool and spa equipment design\, installation\, functionality\, sanitation\, and disposal. The course will Identify the safety hazards that are often faced in the profession and how to avoid them and will provide detailed instructions on how to design a safe hydraulic system and identify the required documentation that must be submitted to a building department in order to obtain a pool permit and will also offer guidelines about how to recognize a safe hydraulic design as well as the required data and documentation that must be submitted in order to approve a residential pool permit. Detailed instructions are provided on how to design a safe\, hydraulic system and identify the required documentation that must be submitted to a building department in order to obtain a pool permit. This part will also indicate to Building Officials how to recognize a safe hydraulic design and the information that should be supplied in order to approve a commercial pool permit.
URL:https://www.iccsafe.org/news-and-events-calendar/2024-ispsc-design-installation-and-inspection-principles-online-live/
LOCATION:Webinar\, Webinar\, United States
CATEGORIES:Education Calendar
ORGANIZER;CN="ICC Training":MAILTO:learn@iccsafe.org
GEO:37.4228823;-122.0887653
X-APPLE-STRUCTURED-LOCATION;VALUE=URI;X-ADDRESS=Webinar Webinar United States;X-APPLE-RADIUS=500;X-TITLE=Webinar:geo:-122.0887653,37.4228823
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20260129T140000
DTEND;TZID=America/New_York:20260129T163000
DTSTAMP:20260502T062955
CREATED:20251202T182017Z
LAST-MODIFIED:20260120T172932Z
UID:620256-1769695200-1769704200@www.iccsafe.org
SUMMARY:Wind Load Provisions of ASCE 7-22
DESCRIPTION:ASCE 7-22 is adopted by the 2024 IBC\, which will be published later this year. The changes from ASCE 7-16 to ASCE 7-22 are so numerous and so substantive that learning about them needs to start now. The chapter on flood loads is the only chapter that has escaped any change. There are huge changes in snow load\, ice load\, and tsunami load provisions. There is a whole new chapter (32) on tornado loads. Risk Category III or IV structures located in the tornado-prone region shown in a figure are required to be designed and constructed to resist the greater of the tornado loads determined in accordance with Chapter 32 or the wind loads determined in accordance with Chapters 26 through 31. The changes in Chapters 11-23 on earthquake loads and Chapters 26-31 on wind loads are many and many of the seismic changes mark significant departures from past practice. ASCE 7-22 load combinations and importance factors are also quite different because of changes in the loads chapters.
URL:https://www.iccsafe.org/news-and-events-calendar/wind-load-provisions-of-asce-7-22/
LOCATION:Webinar\, Webinar\, United States
CATEGORIES:Education Calendar
ORGANIZER;CN="S. K. Ghosh Associates":MAILTO:kbhaumik@skghoshassociates.com
GEO:37.4228823;-122.0887653
X-APPLE-STRUCTURED-LOCATION;VALUE=URI;X-ADDRESS=Webinar Webinar United States;X-APPLE-RADIUS=500;X-TITLE=Webinar:geo:-122.0887653,37.4228823
END:VEVENT
END:VCALENDAR