BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ICC - ECPv6.15.17//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:ICC
X-ORIGINAL-URL:https://www.iccsafe.org
X-WR-CALDESC:Events for ICC
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Chicago
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20230312T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20231105T070000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20240310T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20241103T070000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20250309T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20251102T070000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20240827T080000
DTEND;TZID=America/Chicago:20240828T120000
DTSTAMP:20260412T212400
CREATED:20240613T182455Z
LAST-MODIFIED:20240613T182455Z
UID:563550-1724745600-1724846400@www.iccsafe.org
SUMMARY:ICC 605 IS-MHRRC In-Person Committee Meeting
DESCRIPTION:Multi-Hazard Resiliency for Residential Construction (IS-MHRRC) Committee \nThe purpose of this in-person meeting is for the IS-MHRRC committee to discuss the development of the new ICC 605 standard.	 \nSchedule: \nAugust 27th: 8:00 A.M. – 4:00 P.M. MDT\nAugust 28th: 8:00 A.M. – 12:00 P.M. MDT \nAgenda: \nTASK GROUPS PRESENTATION AND DISCUSSION \nA.	Administrative Requirements\nB.	Site and Area Requirements\nC.	Building Design Requirements
URL:https://www.iccsafe.org/news-and-events-calendar/icc-605-is-mhrrc-in-person-committee-meeting/
LOCATION:Colorado Division of Fire Prevention and Control\, 710 Kipling Street\, Lakewood\, CO\, 80215\, United States
CATEGORIES:Codes & Standards Calendar
ORGANIZER;CN="Keith Enstrom":MAILTO:kenstrom@iccsafe.org
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20240828T000000
DTEND;TZID=America/Chicago:20240828T010000
DTSTAMP:20260412T212400
CREATED:20240813T182352Z
LAST-MODIFIED:20240813T182352Z
UID:567305-1724803200-1724806800@www.iccsafe.org
SUMMARY:Global Membership Council Meeting
DESCRIPTION:Guest speaker is founder and CEO of the Resilient Building Council (RBC)\, Kate Cotter. Cotter has been a strong community resilience advocate and volunteer and has held leadership positions in successful digital technology companies prior to establishing RBC \nRegister here. \n12:00 A.M. – 1:00 A.M. EST \n5:00 A.M. – 6:00 A.M. BST \n2:00 P.M. – 3:00 P.M. AEST \n 
URL:https://www.iccsafe.org/news-and-events-calendar/global-membership-council-meeting-3/
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20240828T110000
DTEND;TZID=America/Chicago:20240828T130000
DTSTAMP:20260412T212400
CREATED:20240726T203223Z
LAST-MODIFIED:20240726T203223Z
UID:566063-1724842800-1724850000@www.iccsafe.org
SUMMARY:PART 1 - Seismic Design Provisions of ASCE 7-22
DESCRIPTION:Part 1: Chapter 11: Seismic Design Criteria\nASCE 7-22 is adopted by the 2024 IBC\, which will be published later this year. The changes from ASCE 7-16 to ASCE 7-22 are so numerous and so substantive that learning about them needs to start now. The chapter on flood loads is the only chapter that has escaped any change. There are huge changes in snow load\, ice load\, and tsunami load provisions. There is a whole new chapter (32) on tornado loads. Risk Category III or IV structures located in the tornado-prone region shown in a figure are required to be designed and constructed to resist the greater of the tornado loads determined in accordance with Chapter 32 or the wind loads determined in accordance with Chapters 26 through 31. The changes in Chapters 11-23 on earthquake loads and Chapters 26-31 on wind loads are many and many of the seismic changes mark significant departures from past practice. ASCE 7-22 load combinations and importance factors are also quite different because of changes in the loads chapters. \nThis four-part webinar focuses on the seismic design provisions (Chapters 11 through 23) of ASCE 7-22 and will introduce the major changes to attendees\, will explain the changes and discuss their impact. \nPart 1: Chapter 11: Seismic Design Criteria\nPart 2: Chapter 12: Seismic Design Buildings\nPart 3: Chapter 13: Seismic Design of Nonstructural Components\nPart 4: Chapter 14 – 15: Seismic Design of Nonbuilding Structures and Material Specific Requirements \nRegister here. \n11:00 A.M. – 1:00 P.M.
URL:https://www.iccsafe.org/news-and-events-calendar/part-1-seismic-design-provisions-of-asce-7-22/
CATEGORIES:Education Calendar
ORGANIZER;CN="S. K. Ghosh Associates":MAILTO:kbhaumik@skghoshassociates.com
END:VEVENT
END:VCALENDAR