BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ICC - ECPv6.15.17//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://www.iccsafe.org
X-WR-CALDESC:Events for ICC
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Chicago
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20230312T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20231105T070000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20240310T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20241103T070000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20250309T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20251102T070000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20240910T110000
DTEND;TZID=America/Chicago:20240910T133000
DTSTAMP:20260416T170226
CREATED:20240827T202340Z
LAST-MODIFIED:20240827T202340Z
UID:568440-1725966000-1725975000@www.iccsafe.org
SUMMARY:PART 3 - Seismic Design Provisions of ASCE 7-22
DESCRIPTION:Part 3: Chapter 13 – Seismic Design of Nonstructural Components \nASCE 7-22 is adopted by the 2024 IBC\, which will be published later this year. The changes from ASCE 7-16 to ASCE 7-22 are so numerous and so substantive that learning about them needs to start now. The chapter on flood loads is the only chapter that has escaped any change. There are huge changes in snow load\, ice load\, and tsunami load provisions. There is a whole new chapter (32) on tornado loads. Risk Category III or IV structures located in the tornado-prone region shown in a figure are required to be designed and constructed to resist the greater of the tornado loads determined in accordance with Chapter 32 or the wind loads determined in accordance with Chapters 26 through 31. The changes in Chapters 11-23 on earthquake loads and Chapters 26-31 on wind loads are many and many of the seismic changes mark significant departures from past practice. ASCE 7-22 load combinations and importance factors are also quite different because of changes in the loads chapters. \nRegister here. \n11:00 AM – 1:30 PM PT
URL:https://www.iccsafe.org/news-and-events-calendar/part-3-seismic-design-provisions-of-asce-7-22/
CATEGORIES:Education Calendar
ORGANIZER;CN="S. K. Ghosh Associates":MAILTO:kbhaumik@skghoshassociates.com
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20240910T150000
DTEND;TZID=America/Chicago:20240910T163000
DTSTAMP:20260416T170226
CREATED:20240827T213015Z
LAST-MODIFIED:20240909T185354Z
UID:568464-1725980400-1725985800@www.iccsafe.org
SUMMARY:Preparing for the Building Codes Plus Up in the 2024 FEMA BRIC Cycle
DESCRIPTION:Agenda: \nThis year (FY 2024) we expect FEMA’s Building Resilient Infrastructure and Communities (BRIC) grant program to include another round of dedicated funds for code activities (“Codes Plus Up”). Join us to hear from FEMA and from ICC members who have successfully navigated previous BRIC cycles including last year’s code-specific project proposals.\nRegister here. \n3:00 PM – 4:30 PM EST
URL:https://www.iccsafe.org/news-and-events-calendar/preparing-for-the-building-codes-plus-up-in-the-2024-fema-bric-cycle/
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20240911T090000
DTEND;TZID=America/Chicago:20240911T170000
DTSTAMP:20260416T170226
CREATED:20240904T170448Z
LAST-MODIFIED:20240904T170448Z
UID:569002-1726045200-1726074000@www.iccsafe.org
SUMMARY:NIST Standards Forum
DESCRIPTION:NIST staff and stakeholders in the private sector and other federal agencies will learn how NIST is advancing standardization for critical and emerging technologies (CETs) through public-private partnerships\, and ways their organizations and agencies can participate in this important activity. The Forum will feature NIST Director\, Dr. Laurie Locascio\, who will deliver the morning Keynote Address on the National Standards Strategy for Critical and Emerging Technology and the NSSCET Implementation Roadmap which was launched at a White House event in late July. Gordon Gillerman\, NIST Conformity Assessment Advisor\, will deliver the afternoon Keynote Address on The Role of Conformity Assessment in CETs. \nLearn more and register here.
URL:https://www.iccsafe.org/news-and-events-calendar/nist-standards-forum/
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20240912T110000
DTEND;TZID=America/Chicago:20240912T133000
DTSTAMP:20260416T170226
CREATED:20240827T202552Z
LAST-MODIFIED:20240827T202552Z
UID:568442-1726138800-1726147800@www.iccsafe.org
SUMMARY:PART 4 - Seismic Design Provisions of ASCE 7-22
DESCRIPTION:Part 4: Chapter 14 – 15: Seismic Design of Nonbuilding Structures and Material Specific Requirements \nASCE 7-22 is adopted by the 2024 IBC\, which will be published later this year. The changes from ASCE 7-16 to ASCE 7-22 are so numerous and so substantive that learning about them needs to start now. The chapter on flood loads is the only chapter that has escaped any change. There are huge changes in snow load\, ice load\, and tsunami load provisions. There is a whole new chapter (32) on tornado loads. Risk Category III or IV structures located in the tornado-prone region shown in a figure are required to be designed and constructed to resist the greater of the tornado loads determined in accordance with Chapter 32 or the wind loads determined in accordance with Chapters 26 through 31. The changes in Chapters 11-23 on earthquake loads and Chapters 26-31 on wind loads are many and many of the seismic changes mark significant departures from past practice. ASCE 7-22 load combinations and importance factors are also quite different because of changes in the loads chapters. \nRegister here. \n11:00 AM – 1:30 PM PT
URL:https://www.iccsafe.org/news-and-events-calendar/part-4-seismic-design-provisions-of-asce-7-22/
CATEGORIES:Education Calendar
ORGANIZER;CN="S. K. Ghosh Associates":MAILTO:kbhaumik@skghoshassociates.com
END:VEVENT
END:VCALENDAR