BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ICC - ECPv6.15.17//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://www.iccsafe.org
X-WR-CALDESC:Events for ICC
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Chicago
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20240310T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20241103T070000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20250309T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20251102T070000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
TZNAME:CDT
DTSTART:20260308T080000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
TZNAME:CST
DTSTART:20261101T070000
END:STANDARD
END:VTIMEZONE
BEGIN:VTIMEZONE
TZID:America/Los_Angeles
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:20240310T100000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:20241103T090000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:20250309T100000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:20251102T090000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:20260308T100000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:20261101T090000
END:STANDARD
END:VTIMEZONE
BEGIN:VTIMEZONE
TZID:America/New_York
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20240310T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20241103T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20250309T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20251102T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20260308T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20261101T060000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20250825T090000
DTEND;TZID=America/Chicago:20250827T160000
DTSTAMP:20260415T235619
CREATED:20250613T185859Z
LAST-MODIFIED:20250613T185859Z
UID:590905-1756112400-1756310400@www.iccsafe.org
SUMMARY:2021 Permit Technician Institute (Online Live)
DESCRIPTION:This Institute provides the permit technician with the knowledge\, skills and abilities needed to perform their jobs in code administration: legal aspects\, code language\, code enforcement\, reading construction documents\, performing plan reviews and the permitting and inspection process. Participants will become familiarized with the International Building Code® (IBC®) and the International Residential Code® (IRC®) and sharpen customer relations skills. This Institute is designed to familiarize and assist permit technicians in locating\, describing and applying concepts from the books Basic Code Enforcement.2021 International Building Code® (IBC®)\, 2021 International Zoning Code® (IZC®) and Legal Aspects of Code Enforcement.
URL:https://www.iccsafe.org/news-and-events-calendar/2021-permit-technician-institute-online-live-2/
CATEGORIES:Education Calendar
ORGANIZER;CN="ICC Training":MAILTO:learn@iccsafe.org
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Los_Angeles:20250826T110000
DTEND;TZID=America/Los_Angeles:20250826T130000
DTSTAMP:20260415T235619
CREATED:20250805T195947Z
LAST-MODIFIED:20250805T195947Z
UID:593260-1756206000-1756213200@www.iccsafe.org
SUMMARY:Designing for Durability and Safety: Seismic\, Fire\, and Construction Considerations for Mass Timber Connections
DESCRIPTION:Mass timber continues to rise in popularity for its sustainability and structural performance – but ensuring the safety and longevity of these systems requires careful attention to connection design. This webinar examines how mass timber beam connections can meet critical requirements for seismic deformation compatibility\, fire resistance\, and durability during and after construction. \nPresenters will review key provisions from ASCE 7\, IBC\, and CSA O86:24\, and share findings from recent testing on concealed beam hangers and steel fasteners. Attendees will learn how to detail connections that perform reliably under seismic drift\, fire exposure\, and fluctuating environmental conditions common on construction sites.
URL:https://www.iccsafe.org/news-and-events-calendar/designing-for-durability-and-safety-seismic-fire-and-construction-considerations-for-mass-timber-connections/
LOCATION:Webinar\, Webinar\, United States
CATEGORIES:Education Calendar
ORGANIZER;CN="S. K. Ghosh Associates":MAILTO:kbhaumik@skghoshassociates.com
GEO:37.4228823;-122.0887653
X-APPLE-STRUCTURED-LOCATION;VALUE=URI;X-ADDRESS=Webinar Webinar United States;X-APPLE-RADIUS=500;X-TITLE=Webinar:geo:-122.0887653,37.4228823
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20250826T160000
DTEND;TZID=America/New_York:20250826T173000
DTSTAMP:20260415T235619
CREATED:20250804T193035Z
LAST-MODIFIED:20250814T175731Z
UID:593200-1756224000-1756229400@www.iccsafe.org
SUMMARY:Global Membership Council Governing Committee Meeting (GMC)
DESCRIPTION:Global Membership Council Governing Committee Teleconference \nTime: Tuesday\, August 26\, 4 p.m. EDT \nLocation:  MS Teams Call (Click to Join) \nJoin Meeting | View Agenda
URL:https://www.iccsafe.org/news-and-events-calendar/global-membership-council-governing-committee-meeting-gmc/
CATEGORIES:Membership Councils
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Chicago:20250827T120000
DTEND;TZID=America/Chicago:20250827T133000
DTSTAMP:20260415T235619
CREATED:20250613T190006Z
LAST-MODIFIED:20250613T190006Z
UID:590907-1756296000-1756301400@www.iccsafe.org
SUMMARY:Fire-resistance\, Solar Panels and ESS (Online Live)
DESCRIPTION:Mid-career residential inspectors and plans examiners will find this seminar insightful as will designers looking for a review of new requirements for fire-resistance between dwelling and townhome units\, addition of solar panels and energy storage systems. The requirements for two-family dwelling and townhome fire-resistance have changed in some unusual ways in the 2024 IRC. The provisions are reviewed\, and consequences of the changes are discussed. Topics included stacked and semi-stacked two-family dwellings\, imaginary lot lines and staggered placement of townhomes. As energy storage systems and solar panels are added to existing and new homes\, requirements for their placement and safe use are added to the code. New requirements for storage new the dwelling or garage are added as well as minimum distance between stacks of the ESS.
URL:https://www.iccsafe.org/news-and-events-calendar/fire-resistance-solar-panels-and-ess-online-live/
CATEGORIES:Education Calendar
ORGANIZER;CN="ICC Training":MAILTO:learn@iccsafe.org
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Los_Angeles:20250828T110000
DTEND;TZID=America/Los_Angeles:20250828T123000
DTSTAMP:20260415T235619
CREATED:20250805T200108Z
LAST-MODIFIED:20250805T200108Z
UID:593262-1756378800-1756384200@www.iccsafe.org
SUMMARY:Welding in Reinforced Concrete Construction
DESCRIPTION:While much less common than in structural steel\, welding has many applications for steel reinforcement in cast-in-place and precast concrete construction. This webinar will cover welding of steel reinforcement in new and existing concrete construction\, provide background on welding process requirements and the development of a PQR (Procedure Qualification Record) and WPS (Welding Procedure Specification)\, discuss design related requirements in ACI 318 and AWS D1.4\, and address construction and special inspection requirements of the IBC.
URL:https://www.iccsafe.org/news-and-events-calendar/welding-in-reinforced-concrete-construction-2/
LOCATION:Webinar
CATEGORIES:Education Calendar
ORGANIZER;CN="S. K. Ghosh Associates":MAILTO:kbhaumik@skghoshassociates.com
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20250829
DTEND;VALUE=DATE:20251030
DTSTAMP:20260415T235619
CREATED:20250828T202931Z
LAST-MODIFIED:20250828T203000Z
UID:595796-1756425600-1761782399@www.iccsafe.org
SUMMARY:2027 ICC Performance Code (ICCPC) Public Input
DESCRIPTION:In accordance with the International Code Council’s Consensus Procedures (ANSI)\,the initial draft of the ICC Performance Code (ICCPC)\, is available for public input for a period of 60 days starting August 29\, 2025 and ending October 29\, 2025. \nTo view the initial draft\, click here. \nChanges may be submitted to the initial draft of the 2027 ICCPC here.
URL:https://www.iccsafe.org/news-and-events-calendar/icc-performance-code-iccpc-public-input/
CATEGORIES:Codes & Standards Calendar
END:VEVENT
END:VCALENDAR