The Precast/Prestressed Concrete Institute (PCI), in collaboration with the International Code Council (ICC), is developing a new standard, ICC/BSR/PCI 155-202x: Specification for Test Method of Precast Concrete Insulated Wall Panel Wythe Connectors, to establish test…
Technical Topics
Practical articles that detail technical content, with charts/graphs/visuals to help readers break down information.
Announcing New Standard ICC/BSR/PCI 155-202x: Specification for Test Method of Precast Concrete Insulated Wall Panel Wythe Connectors
This standard will establish test method protocol for the determination of wythe connector properties.
Is Continued Use of the Two-Period Design Spectrum in the Equivalent Lateral Force Procedure of Seismic Design Permitted by ASCE 7-22?
We interpret ASCE 7-22 to permit the continued use of the two-period design response spectrum in the ELF procedure.
Judging by the number of inquiries received, there appears to be significant confusion as to whether the two-period design response spectrum of ASCE 7-22 Figure 11.4-1 can continue to be…
The Critical Necessity of Fuel Gas Inspections (& Fuel Gas Inspection Protocol Survey)
Fuel gas inspections are the frontline defense against potential disasters. This proactive approach not only enhances safety but also promotes energy efficiency, helping to lower utility costs.
In today’s energy-driven world, the importance of fuel gas inspections cannot be overstated. These inspections are not just a regulatory checkbox, but a vital safeguard that can prevent catastrophic explosions…