Current Code Development Cycle

Current Code Development Cycle

Current Code Development Cycle

News
News

2015 ICC Group A Public Comment Agenda Now Available. The agenda includes proposed code changes to the Group A codes for consideration during the Public Comment Hearings, Sept. 30–Oct. 5 at the Long Beach (Calif.) Convention Center. Approximately two weeks after the hearings end,  the Online Governmental Consensus Vote will occur on cdpACCESS. The hearings will be webcast. Click here for the agenda.

2015 Group A Public Comment Hearing Schedule Now Available. The schedule for the 2015 Group A Public Comment Hearings, Sept. 30-Oct. 5 in Long Beach, Calif., is now available. The hearings will begin at 8 a.m. on Wednesday, Sept. 30, at the Long Beach Convention Center. The Public Comment Agenda is scheduled to be posted on Aug. 28. Click here for more information on ICC’s current code development cycle.

Welcome to the 2015/2016/2017 Cycle. This will be the first full cycle which implements ICC’s new online system called “cdpACCESS”. Be sure to visit the cdpACCESS webpage. Included with cdpACCESS are the following features:

  • Online collaboration
  • Online code change and public comment development and submittal
  • Online submission of floor modifications while at the Committee Action Hearing
  • Online Assembly Floor Motion Vote following the Committee Action Hearing
  • Online Governmental Consensus Vote following the Public Comment Hearing

The table below includes all the documentation of each phase of the cycle which will result in the 2018 I-Codes. Information is posted as the Code Development process proceeds. There have been some changes to the Code Groupings from the previous cycle. They are:

  • Codes moved to Group A: IEBC non-structural; IPMC; IRC-M, IRC-P; ISPSC; IZC
  • Codes moved to Group B: IBC - S (which also includes IEBC structural provisions)

Be sure to consult with the "2015/2016/2017 Code Committee Responsibility" matrix (see link in table) to determine where code provisions are maintained by a committee other than the committee which typically has responsibility for maintaining the code provisions. For example, Chapter 9 of the IBC is typically the responsibility of the IBC – Fire Safety, a Group A code committee. However, numerous sections include an [F] in the code to indicate that the provisions are maintained by the IFC code committee, a Group B code committee. As such, proposed changes to these sections in the IBC would be considered in Group B in 2016. This type of information has been collected and placed in the matrix for ease of reference. A complete description of the codes is included in the "Code Development Schedule" (see link in table).

2015 / 2016 / 2017 Code DevelopmentInformation
Code Development ScheduleUpdated: July 31, 2015
Call for CommitteesPosted: January 31, 2014
Application deadline: June 2, 2014
Code Committee Responsibility MatrixPosted: July 1, 2014
Updated: August 20, 2015

 

2015 Cycle - Group AInformation
Group A: IBC - E, IBC - FS, IBC - G, IEBC, IFGC, IMC, IPC, IPMC, IPSDC, IRC - M, IRC - P, ISPSC, IZCCommittee Rosters
Posted: December 30, 2014
Log on to cdpACCESSNovember 17, 2014
Online code change submittal deadline via cdpACCESSCode changes due: January 14 at 11:59 p.m. Pacific time
Committee Action Hearing (CAH) SchedulePosted: February 20, 2015
Proposed ChangesPosted: March 13, 2015
Proposed New Standards AnalysesPosted: April 2, 2015
Online Floor Modifications InstructionsPosted: April 7, 2015
Online Floor Modifications FAQsPosted: April 16, 2015
Tentative Hearing OrdersPosted: April 17, 2015
Committee Action Hearings (CAH)April 19 - 29, 2015
Memphis Cook Convention Center
Memphis, Tennessee
WebcastActive during April 19 - 29, 2015
Updated Hearing OrdersUpdated during the hearings
Unofficial ResultsUpdated during the hearings
Committee Action Hearing ResultsPosted: May 11, 2015
Online CAH Assembly Floor Motion Voting periodOpen May 14 – 28, 2015
Report of the Committee Action HearingPosted: June 5, 2015
Updated: June 18, 2015
Online public comment submittal deadline via cdpACCESSComments due: July 17, 2015
Public Comment Hearing (PCH) SchedulePosted: August 7, 2015
Public Comment AgendaPosted: August 27, 2015
Public Comment Hearings (PCH)September 30 - October 5, 2015
Long Beach Convention Center
Long Beach, CA
WebcastLink only active during Public Comment Hearing
Updated Hearing Order and ResultsDuring PCH
Public Comment Hearing ResultsTo be posted: October 14, 2015
Online Governmental Consensus Voting periodApprox. October 21 - November 3, 2015
Summary of Final Action Group A Code ChangesTo be posted: Approx. November 17, 2015

 

2016 Cycle - Group BInformation
Group B: Admin, IBC-S, IECC-Commercial, IECC/IRC - Residential, IFC, IRC - B, IWUICCommittee Rosters
Posted: December 30, 2014
Log on to cdpACCESSMay 1, 2015
Online code change submittal deadline via cdpACCESSJanuary 11, 2016
Code Correlation Committee considers editorial changesTBD
Committee Action Hearing (CAH) ScheduleTo be posted: February 23, 2016
Proposed ChangesTo be posted: March 8, 2016
Committee Action Hearings (CAH)April 17 – 27, 2016
Kentucky International Convention Center
Louisville, KY
WebcastLink only active during CAH
Updated Hearing Order and ResultsDuring CAH
Committee Action Hearing Results (committee actions only)To be posted: May 6, 2016
Online CAH Assembly Floor Motion Voting periodApprox. May 11 – 24, 2016
Report of the Committee Action HearingTo be posted: June 1, 2016
Online public comment submittal deadline via cdpACCESSJuly 22, 2016
Public Comment Hearing (PCH) ScheduleTo be posted: August 26, 2016
Public Comment AgendaTo be posted: September 9, 2016
Public Comment Hearings (PCH)October 19 - 25, 2016
Kansas City Convention Center
Kansas City, MO
WebcastLink only active during PCH
Updated Hearing Order and ResultsDuring PCH
Public Comment Hearing ResultsTo be posted: November 2, 2016
Online Governmental Consensus Voting periodApprox. Nov 8 – 21, 2016
Summary of Final Action Group B Code ChangesTo be posted: December 6, 2016

 

2017 Cycle - Group CInformation
Group C: IgCCCancelled: ICC and ASHRAE have agreed to consolidate the IgCC and ASHRAE Standard 189.1. ASHRAE will have responsibility for all the technical provisions; thus the 2017 Group C cycle becomes unnecessary, and has been cancelled.