Skip to Main Content

Committee Action Hearings – Group B #2

October 22–30
Live webcast begins at 10 am ET on October 22

This year’s code hearings offer code officials, architects, builders, structural engineers, fire, residential and existing building professionals as well as those responsible for the administration of the International Codes® (I-Codes®), the opportunity to provide input on proposed code changes to the Group B I-Codes. The code hearings are free to attend and open to the public. Registration is required.

The code development process for the 2027 I-Codes introduces a restructured process that began in 2024 with two Committee Action Hearings for Group A Codes, followed in 2025 by two Committee Action Hearings for Group B Codes. In April 2026, there will be combined Group A and B Public Comment Hearings with a combined Online Governmental Consensus Vote in May 2026. Please refer to the 2024/2025/2026 ICC Code Development Schedule for details on code groups and important deadlines.

Group B Codes include:

Admin
IBC
IEBC
IgCC
IPMC
IRC
IZC

Additional details on Group B codes:

  • Admin: Chapter 1 of all the I-Codes except the IgCC and IRC. Also includes the update of currently referenced standards in all of the 2021 Codes, except the IgCC. See Code Group Notes below for the IECC and the ICC PC.
  • IBC-G: IBC General provisions. Chapters 3 – 6, 12, 13, 27 – 33.
  • IBC-S: IBC Structural provisions. IBC Chapters 15 – 25 and IEBC structural provisions. See Code Group Notes.
  • IEBC: IEBC Non-structural provisions. See Code Group Notes.
  • IgCC: The administration provisions of Chapter 1 of the IgCC in order to provide for coordination with the other administrative provisions in the I-Codes. Additionally, Appendix M included as it is not included in ASHRAE Standard 189.1. Remainder of the code is based on the provisions of ASHRAE Standard 189.1 Standard for the Design of High-Performance Green Buildings, Except Low-Rise Residential Buildings.
  • IPMC: Code changes heard by the IPM/ZC (combined IPMC & IZC code committee)
  • IRC-B: IRC Building provisions. Chapters 1 – 10
  • IZC: Code changes heard by the IPM/ZC (combined IPMC & IZC code committee)

Stay Informed with Text Message Updates

Save valuable time and stay on schedule by signing up to receive text message updates about the progress of code change hearings during the Code Council's 2025 Committee Action Hearings Group B #2. Opt-in to receive text messages. Standard text messaging charges may apply. To unsubscribe, text STOP to 77453. For help text HELP anytime.

If you've opted-out of this service in the past, you need to text UNSTOP to 866‑806‑9422. This will remove the block on a carrier level. Then you will need to opt‑in again.